Abstract
The Hercílio Luz suspension bridge, built in 1926, has been out of service since 1991 due to high corrosion levels and structural element impairment. A complete rehabilitation project was developed which included the replacement of the impaired items and foundation strengthening. For this, an auxiliary structure was employed to support the central span during the rehabilitation process. A carefully studied load transfer process, where the central span loading is transferred from the eye-bar towards the auxiliary structure will be performed. For this purpose, a synchronized jacking sequence will be used, which was predefined by means of numerical model analysis. All structural elements had their designs evaluated and some geometric changes were implemented. This paper presents all the methodology developed in the rehabilitation project of Hercilio Luz bridge, as well as the development stages up to the present date.
Keywords
How to cite
APA
IEEE
MLA
Chicago
Harvard
Vancouver
BibTeX
RIS
Licence
May be shared and adapted, provided appropriate credit is given. Copyright © 2017 Fracture and Structural Integrity.
Copyright
Authors are allowed to retain both the copyright and the publishing rights of their articles without restrictions.
Open Access Statement
Fracture and Structural Integrity (F&SI) is an open-access journal which means that all content is freely available without charge to the user or his/her institution. Users are allowed to read, download, copy, distribute, print, search, or link to the full texts of the articles in this journal without asking prior permission from the publisher or the author. This is in accordance with the DOAI definition of open access.
F&SI operates under the Creative Commons Licence Attribution 4.0 International (CC-BY 4.0). This allows to copy and redistribute the material in any medium or format, to remix, transform and build upon the material for any purpose, even commercially, but giving appropriate credit, providing a link to the license, and indicating if changes were made.
Similar articles
Most read articles by the same author(s)
- Paulo Mendes, José A.F.O. Correia, Abílio M.P. De Jesus, Bianca Ávila, Hermes Carvalho, Filippo Berto, A brief review of fatigue design criteria on offshore wind turbine support structures , Fracture and Structural Integrity: Vol 15 No 55 (2021): January 2021
- Sebastião Salvador Real Pereira, Hermes Carvalho, João Victor Fragoso Dias, Victor Roberto Verga Mendes, Pedro Aires Montenegro, Behavior of precast reinforced concrete columns subjected to monotonic short-term loading , Fracture and Structural Integrity: Vol 13 No 50 (2019): October 2019
- Carla Cristiane Silva, Rodrigo Barreto Caldas, Ricardo Hallal Fakury, Hermes Carvalho, João Victor Fragoso Dias, Web Rotational Stiffness of Continuous Steel-Concrete Composite Castellated Beams , Fracture and Structural Integrity: Vol 13 No 50 (2019): October 2019